Pankow provided preconstruction and construction services for Phase 1B of the Wilshire Boulevard Temple Master Plan.
The project consisted of a partial renovation of the historic 1929 School Building, a complete renovation of the 1962 School Building, rework of a portion of the 1st floor of the 1962 Administration building, and the site work associated with the areas surrounding the two schools.
The new parking structure was constructed concurrently with the school renovations.