West 8th

Location: Seattle, Washington
Client: Touchstone Corporation

This 28-story, 520,000 rentable square foot office tower achieved LEED CS Gold (quickly, with no follow-up questions, aided by 13 credits Lewis helped find). The building is structural steel with a concrete core, and features 480 parking spaces both below-grade and on floors 2 and 3. Core construction set a record for cycle time for a Peri system, often just three days per cycle on floors 14-28.

leed-certified-gold